Installing EG4 Chargeverter 5kW on Outback Power System
The Chargeverter 5kW is simple to install on EG4 systems, but requires unique installation on Outback Power and some other systems.
The Chargeverter 5kW is simple to install on EG4 systems, but requires unique installation on Outback Power and some other systems.
This didn’t go nearly as fast as I had expected. It took a little trial and error.
Though possible to do this by oneself, it is certainly easier with some help.
Adding to my current solar system to have full redundancy.
Though the EG4 LL V2 battery modules do not support BMS Tools being able to read a daisy-chain, there is another way.
Our failed attempt at moving this beast of a battery.
This industrial flooded lead acid battery (FLAB) has been a real work horse for me, but I will not miss it.
I just can’t believe this! This is a serious down-grade from the EG4 LiFePower4.
I’ve run out of patience with EG4 & Signature Solar.
I’m losing patience with EG4 & Signature Solar. If you have received one of the racks from Signature Solar, you may want to check your buss bars. Some of the racks have buss bars that are poorly designed and pose a potential fire hazard.